WW New Technology and Lab 101

Acoustic collections analysis, a new design for sewer pipe and Lab 101

Back to Events
Wednesday, March 18, 2020
8:30 AM - 4:00 PM (MDT)
This will be an online class. You will be provided a link to attend the seminar online once you have completed your registration.

Event Details

This training addresses and demonstrates BIG changes in the WW industry. Acoustic sound technology and a brand new sewer pipe named Perfect Product.

John Mackey of the DWQ will help you read and understand your lab results from your laboratory. Several lagoon systems have been dumped on with Toxic loading and this will help you understand what those strange numbers on your report could mean.

Agenda

March 18
8:30 AM - 10:30 AM Acoustic sound inspections New Technology for main line inspections and approved by the DWQ. This new technology can save you Big Bucks in cleaning and documenting.
10:30 AM - 10:45 AM Break
10:45 AM - 12:00 PM Acoustic sound inspections New Technology for main line inspections and approved by the DWQ. This new technology can save you Big Bucks in cleaning and documenting.
12:00 PM - 1:00 PM Lunch
1:00 PM - 2:45 PM "Perfect" Products These products are geared towards new installations and are known as Perfect Pipe and Perfect Manholes. Perfect Pipe and Perfect Manholes combine the benefits of robust concrete and durable synthetic liners; the ideal combination of a structure and a conduit. Perfect Pipe is a concrete pipe produced with the full protection of a robust liner and joint system made of HDPE, a high-quality synthetic material.
2:30 PM - 2:45 PM Break
2:45 PM - 4:00 PM Lab 101 John Mackey from the DWQ will help you read and understand your lab results from the laboratory. Several lagoon systems have been dumped on with toxic loading and this will help you understand what those strange numbers on your report could mean.